SafStor & Extra
Space Storage

Collins Contracting performed excavation and site utility work for ARCO Design/Building to develop a 100,000 SF Extra Space Storage facility located near the Garrisonville exit in Stafford, VA. The site required nearly 45,000 CY of dirt export, retaining walls, utility installation, a specialized storm water management facility, and traffic improvement to Rt 1.

Client: ARCO Design Build

Location: Garrisonville, VA

Area: 100,000 SF building on 4.5 acres

Year: 2019

Budget: $1.2 million

Engineer: Welford Engineering Associates

Sector:

Secondary headline here.

It all begins with an idea. Maybe you want to launch a business. Maybe you want to turn a hobby into something more. Or maybe you have a creative project to share with the world. Whatever it is, the way you tell your story online can make all the difference.

Previous
Previous

Mapei Warehouse Expansion

Next
Next

The Heights at Jackson Village